How this calculation works
- Area is the room rectangle. A 5×8 full bath is 40 sq ft even if the shower is only part of it.
- Tiers load typical US installed $/sq ft bands. A tiny powder room can still be pricey per foot because of the toilet rough-in.
- Moving wet fixtures applies a 1.3× planning bump. Extras add known dollars (glass door, heated floor) you already priced.
range = area × $/sq ft × (layout ? 1.3 : 1) + extras
What to do next
- If you are touching the shower, budget for a proper liner or membrane—not just pretty tile.
- Ventilation matters as much as fixtures. A quiet, ducted fan is cheaper than a mold teardown.
- Get bids that specify waterproofing system, not only fixture brand names.
FAQ
- Why can a powder room cost as much as a small kitchen per foot?
- You still pay a plumber and electrician to mobilize, plus tile or wallpaper in a tight space. Per-square-foot averages mislead on very small rooms; use extras and local bids.
- Is a tub-to-shower conversion in this range?
- Sometimes, if the drain stays. If the drain moves or walls come open, treat it as a layout change and expect the high end—or a custom bid.
Sources
- Range = area × tier $/sq ft (editable). Tiers are rounded US planning bands, 2026
Cost defaults are typical US planning bands, last reviewed 2026-08-25. Edit the price fields on this page rather than treating them as a local market index.