How this calculation works
- Measured area is a rectangle or a sum of rectangles you already added up.
- Waste covers trim pieces at beds and edges. Leftover sod rarely stores well, so modest extra is cheaper than a second delivery.
- Pallets = ceil(order sq ft / sq ft per pallet). Price is order area × your $/sq ft (often farm price; install is extra).
order sq ft = area × (1+waste%); pallets = ceil(order / pallet coverage)
What to do next
- Confirm pallet square footage on the invoice—500 is a default, not a law.
- Grade and water before the truck arrives. Sod on a cloddy, dry base fails even if the quantity was perfect.
- Ask about species (fescue, bermuda, zoysia, etc.) for your sun and climate; this tool does not choose grass.
FAQ
- Should I include the area under future mulch beds?
- No. Measure only what you will sod. It is cheaper to skip sod under a planned bed than to cut it out later.
- Is the default price installed or farm pickup?
- It is a planning material number. Installed sod (grade, soil, lay, first water) is a different bid. Edit the price to match the quote you have.
Sources
- Order area = measured area × (1 + waste%). Pallet coverage is farm-specific (often ~450–500 sq ft)
Cost defaults are typical US planning bands, last reviewed 2026-08-25. Edit the price fields on this page rather than treating them as a local market index.